Infrastructure · 2038

Arctic Corridor

Year-round Arctic routes raise port output by 10%.

speculative Epoch VIII
Infrastructure
Arctic Corridor2038
Unlocks

No follow-up technologies in the current build.

Effects
  • Modifier production.port +10 %
Branch
Infrastructure
Historical year
2038
Research cost
10,000
Epoch
VIII

Data from the current build (content.json). Cost in research points; in the game more expensive when researching ahead, cheaper when behind.