Infrastructure · 2047
Superconducting Grids
Low-loss transmission raises power generation by 5%.
speculative
Epoch IX
Prerequisites
Supergrid2040
Infrastructure
Superconducting Grids2047
Unlocks
No follow-up technologies in the current build.
Effects
- Modifier production.electricity +5.0 %
- Branch
- Infrastructure
- Historical year
- 2047
- Research cost
- 18,000
- Epoch
- IX
Data from the current build (content.json). Cost in research points; in the game more expensive when researching ahead, cheaper when behind.