Resources

Coal Mine

Mines coal for steel, cement and thermal power plants; needs a coal deposit.

As of version 0.2.0 What’s new?

Cost
$3.3bn
Build time
360 days
Workforce
9,000
Maximum level
30
Construction goods
Cement 60, Machinery 30, Steel 60
Requirements
Deposit
Coal
Technology
–

Production methods per level and day

Production methodsInputsOutputsWorkforceTechnology
Underground Mining Electricity 0.5, Machinery 0.2 Coal 100 9,000 –
Open-Pit Mining Fuel 3, Machinery 0.4 Coal 160 3,500 Heavy Industry