Buildings

Buildings are built in levels and turn goods and workers into new goods with their production method. Values per level and day.

As of version 0.2.0 What’s new?

Agriculture 2

BuildingOutputsCostBuild timeWorkforceRequirements
Farm Food $5bn 180 120,000 –
Fish Farm Food $1.2bn 240 10,000 Industrial Aquaculture

Resources 10

BuildingOutputsCostBuild timeWorkforceRequirements
Logging Camp Timber $1.8bn 120 8,000 –
Coal Mine Coal $3.3bn 360 9,000 –
Iron Mine Iron Ore $2.6bn 360 5,000 –
Bauxite Mine Bauxite $2.1bn 300 3,000 –
Copper Mine Copper $3bn 420 5,000 –
Oil Field Crude Oil $10bn 540 2,000 –
Gas Field Natural Gas $8.1bn 540 1,500 –
Uranium Mine Uranium $3.5bn 480 2,000 –
Rare Earth Mine Rare Earths $2.5bn 480 2,000 –
Lithium Extraction Lithium $2.5bn 480 1,500 Lithium-Ion Mass Production

Industry 13

BuildingOutputsCostBuild timeWorkforceRequirements
Steel Mill Steel $4.5bn 540 3,400 –
Aluminium Smelter Aluminium $1.4bn 540 1,500 –
Cement Plant Cement $1.5bn 360 1,200 –
Refinery Chemicals , Fuel $2bn 720 1,500 –
Chemical Plant Chemicals , Fertilizer , Plastics $3.2bn 540 2,500 –
Electronics Factory Electronics $5.6bn 360 12,000 Electronics
Semiconductor Fab Semiconductors $2bn 900 2,000 Semiconductors
Machinery Plant Machinery $11bn 450 18,000 –
Vehicle Plant Vehicles $18bn 540 24,000 –
Consumer Goods Factory Consumer Goods $16bn 270 60,000 –
Textile Mill Clothing $2.8bn 240 30,000 –
Pharmaceutical Plant Pharmaceuticals $4.8bn 450 12,000 Modern Medicine
Battery Factory Batteries $2.2bn 540 4,000 Lithium-Ion Mass Production

Energy 7

BuildingOutputsCostBuild timeWorkforceRequirements
Thermal Power Plant Electricity $5.9bn 720 600 –
Nuclear Power Plant Electricity $6.6bn 1,800 800 Nuclear Power
Hydroelectric Plant Electricity $3.7bn 1,440 200 –
Renewable Park Electricity $1.4bn 360 300 Wind Power
Electrolyser Hydrogen $1.3bn 360 300 Green Hydrogen
Geothermal Plant Electricity $4.3bn 900 200 Enhanced Geothermal
Fusion Power Plant Electricity $11bn 1,800 600 Fusion Demonstration Plant

Infrastructure 4

BuildingOutputsCostBuild timeWorkforceRequirements
Transport Hub Services $2bn 540 20,000 –
Port Services $2.8bn 720 4,000 –
Service Centre Services $14bn 270 150,000 –
Data Centre Services $1bn 540 800 Hyperscale Data Centres

Public 2

BuildingOutputsCostBuild timeWorkforceRequirements
University Research points 5 $1.6bn 720 8,000 –
Space Centre Research points 6 $3bn 1,080 6,000 Launch Vehicles

Military 5

BuildingOutputsCostBuild timeWorkforceRequirements
Barracks Garrison 1, Recruitment 1 $600M 180 2,000 –
Arms Factory Arms and Equipment $1.8bn 540 4,000 –
Munitions Plant Munitions $1.7bn 360 5,000 –
Shipyard Shipyard slots 1 $900M 540 3,000 Naval Warfare
Air Base Air wing slots 2 $700M 360 1,500 –