Infrastructure
Data Centre
Data centre: provides high-value services using a lot of electricity and semiconductors.
As of version 0.2.0 What’s new?
- Cost
- $1bn
- Build time
- 540 days
- Workforce
- 800
- Maximum level
- 20
- Construction goods
- CementCementProcessed MaterialsBase price$20kProduced in (buildings)1Used by (buildings)0Construction good for almost every building. 60, ElectronicsElectronicsHigh TechnologyBase price$400kProduced in (buildings)1Used by (buildings)16Input for modern industry, services, power plants and armaments. 80, MachineryMachineryHigh TechnologyBase price$350kProduced in (buildings)1Used by (buildings)16Capital good for industry, mining and construction. 30, SteelSteelProcessed MaterialsBase price$80kProduced in (buildings)1Used by (buildings)6The most important base material for machinery, vehicles, construction, ships and armaments. 40
Requirements
- Technology
- Hyperscale Data CentresHyperscale Data CentresElectronics and AI · 2012Cost4,800 pointsPrerequisites2Allows data centres that produce services with lots of power and few workers.
Production methods per level and day
| Production methods | Inputs | Outputs | Workforce | Technology |
|---|---|---|---|---|
| Cloud Data Centre | ElectricityElectricityEnergyBase price$40kProduced in (buildings)6Used by (buildings)33Electricity is needed almost everywhere and is not traded over long distances – power plants at home matter. 15, ElectronicsElectronicsHigh TechnologyBase price$400kProduced in (buildings)1Used by (buildings)16Input for modern industry, services, power plants and armaments. 0.8, SemiconductorsSemiconductorsHigh TechnologyBase price$900kProduced in (buildings)1Used by (buildings)6High-tech input for electronics, vehicles, armaments and data centres – few producers, high dependency. 0.4 | ServicesServicesServicesBase price$30kProduced in (buildings)4Used by (buildings)2Services are not shipped and make up the largest part of the GDP of modern economies. 80 | 800 | – |
| AI Services | ElectricityElectricityEnergyBase price$40kProduced in (buildings)6Used by (buildings)33Electricity is needed almost everywhere and is not traded over long distances – power plants at home matter. 30, ElectronicsElectronicsHigh TechnologyBase price$400kProduced in (buildings)1Used by (buildings)16Input for modern industry, services, power plants and armaments. 1, SemiconductorsSemiconductorsHigh TechnologyBase price$900kProduced in (buildings)1Used by (buildings)6High-tech input for electronics, vehicles, armaments and data centres – few producers, high dependency. 1.5 | ServicesServicesServicesBase price$30kProduced in (buildings)4Used by (buildings)2Services are not shipped and make up the largest part of the GDP of modern economies. 180 | 600 | Large Language ModelsLarge Language ModelsElectronics and AI · 2022Cost7,000 pointsPrerequisites2Data centres offer AI services; research becomes 5% faster. |