Resources

Gas Field

Extracts natural gas for power plants, refineries and chemicals; needs a gas deposit.

As of version 0.2.0 What’s new?

Cost
$8.1bn
Build time
540 days
Workforce
1,500
Maximum level
40
Construction goods
Cement 30, Machinery 30, Steel 120
Requirements
Deposit
Natural Gas
Technology
–

Production methods per level and day

Production methodsInputsOutputsWorkforceTechnology
Conventional Gas Extraction Electricity 0.3, Machinery 0.2 Natural Gas 200 1,500 –
Shale Gas Extraction Chemicals 2, Electricity 0.5, Machinery 0.5 Natural Gas 280 2,000 Hydraulic Fracturing
Floating LNG Electricity 0.4, Machinery 0.6 Natural Gas 240 1,200 Floating LNG