Energy
Geothermal Plant
Generates electricity from geothermal heat, without fuel.
As of version 0.2.0 What’s new?
- Cost
- $4.3bn
- Build time
- 900 days
- Workforce
- 200
- Maximum level
- 10
- Construction goods
- CementCementProcessed MaterialsBase price$20kProduced in (buildings)1Used by (buildings)0Construction good for almost every building. 80, MachineryMachineryHigh TechnologyBase price$350kProduced in (buildings)1Used by (buildings)16Capital good for industry, mining and construction. 60, SteelSteelProcessed MaterialsBase price$80kProduced in (buildings)1Used by (buildings)6The most important base material for machinery, vehicles, construction, ships and armaments. 60
Requirements
- Technology
- Enhanced GeothermalEnhanced GeothermalEnergy · 2034Cost10,000 pointsPrerequisites2Speculative✓Allows geothermal plants that deliver baseload power without fuel.
Production methods per level and day
| Production methods | Inputs | Outputs | Workforce | Technology |
|---|---|---|---|---|
| Enhanced Geothermal | MachineryMachineryHigh TechnologyBase price$350kProduced in (buildings)1Used by (buildings)16Capital good for industry, mining and construction. 0.2 | ElectricityElectricityEnergyBase price$40kProduced in (buildings)6Used by (buildings)33Electricity is needed almost everywhere and is not traded over long distances – power plants at home matter. 60 | 200 | – |