Resources

Logging Camp

Harvests timber from the region's forests; needs a timber deposit.

As of version 0.2.0 What’s new?

Cost
$1.8bn
Build time
120 days
Workforce
8,000
Maximum level
20
Construction goods
Machinery 5
Requirements
Deposit
Timber
Technology
–

Production methods per level and day

Production methodsInputsOutputsWorkforceTechnology
Manual Logging – Timber 40 8,000 –
Mechanised Logging Fuel 1, Machinery 0.2 Timber 70 3,000 Heavy Industry