Industry

Machinery Plant

Builds machinery from steel, aluminium and electronics – a capital good for almost every industry and construction project.

As of version 0.2.0 What’s new?

Cost
$11bn
Build time
450 days
Workforce
18,000
Maximum level
30
Construction goods
Cement 80, Machinery 40, Steel 100
Requirements
Technology
–

Production methods per level and day

Production methodsInputsOutputsWorkforceTechnology
Conventional Engineering Aluminium 1, Electricity 1.5, Steel 6 Machinery 30 18,000 –
CNC Manufacturing Aluminium 1, Electricity 2, Electronics 1.5, Steel 6 Machinery 37.5 12,000 Industrial Robots
Additive Manufacturing Aluminium 2, Electricity 2.5, Electronics 3, Steel 5 Machinery 45 7,500 Additive Manufacturing
Connected Factory Aluminium 1, Electricity 2.2, Electronics 3, Steel 6 Machinery 45 7,500 Industry 4.0