Infrastructure

Port

Port: raises infrastructure and port capacity, makes the coast a supply source and provides merchant ships for sealift. Coast only.

As of version 0.2.0 What’s new?

Cost
$2.8bn
Build time
720 days
Workforce
4,000
Maximum level
10
Construction goods
Cement 300, Machinery 30, Steel 120
Provides
Infrastructure 1, Port capacity 100
Requirements
Coastal region
✓
Technology
–

Production methods per level and day

Production methodsInputsOutputsWorkforceTechnology
Break-Bulk Handling Electricity 0.3, Fuel 2 Services 20 4,000 –
Container Terminal Electricity 0.4, Fuel 2, Machinery 0.2 Services 30 2,000 Containerisation
Mega-Ship Terminal Electricity 0.4, Fuel 2, Machinery 0.25 Services 35 1,800 Ultra-Large Container Ships
LNG Terminal Electricity 0.6, Fuel 2, Machinery 0.3 Services 37 1,800 LNG Shipping
Automated Terminal Electricity 0.5, Electronics 0.3, Fuel 2, Machinery 0.3 Services 40 800 Automated Container Terminals